负荷管理系统Load Management盒子A · 盒子BBox A · Box B
负荷管理系统 · LOAD MANAGEMENTLOAD MANAGEMENT SYSTEM

容量不变,多装桩;
断网不断,照常充。
More chargers on the same grid connection.
Charging that survives network outages.

盒子 A 逐秒采样回路电流,云端或盒子 B 实时计算,动态分配每台充电桩的可用电流——总负荷始终不超变压器容量。两种方案、有网无网都能跑。Box A samples circuit currents every second; the cloud — or Box B when offline — allocates each charger's current in real time, keeping total load within the transformer capacity. Two plans, online or offline.

6 路 CT 实时采样6 CT channels, live sampling动态负荷均衡Dynamic load balancing断网本地接管Offline failover

1产品定位What it is

两只 DIN 导轨盒子,一套完整的充电负荷管理系统。Two DIN-rail boxes, one complete charging load-management system.

▣

是什么What

充电桩智能负荷管理(DLM)系统:盒子 A 逐秒采样电网进线、光伏与储能回路电流,云端或盒子 B 实时计算,动态分配每台充电桩的可用电流。A charging load-management (DLM) system: Box A samples grid, solar and storage circuits every second; the cloud or Box B computes and allocates each charger's available current in real time.

一句话In one line:容量不变,多装桩。Same capacity, more chargers.
⬒

什么形态Form

盒子 A(必配)=采样 + 传输,接入 6 路 CT;盒子 B(选配)=本地离线服务器,负责无网时的决策。均为 35 mm 标准导轨(DIN 导轨,IEC 60715)安装,A、B 分别只占 65 mm 与 100 mm 的导轨宽度,A 经一根 CAN 线为 B 供电并通信。Box A (required) = sampling + uplink, wired to 6 CTs; Box B (optional) = local offline server making decisions when the network is down. Both mount on 35 mm DIN rail (IEC 60715) and take only 65 mm and 100 mm of rail width; one CAN cable powers B and carries data.

加装 BAdding B:只加一根 CAN 线,A 侧不动线。one CAN cable; no re-wiring at Box A.
✦

解决什么问题Why

变压器容量固定、想多装桩;站点网络不可靠、担心充电停摆;有光伏/储能、想优先消纳本地绿电——三个问题一次解决。Fixed transformer capacity but more chargers wanted; unreliable site networks that could stop charging; solar or storage whose local power should be used first — all three solved at once.

适合Fits:住宅/商业充电站、园区、光储站点。residential and commercial charging sites, campuses, solar sites.

2两种方案 · 四种状态Two plans · four states

方案一(A + 云)适合网络稳定的站点;方案二(A + B + 云)在断网时由 B 本地接管,充电体验与在线一致。Plan 1 (A + cloud) suits sites with stable networks. Plan 2 (A + B + cloud) keeps charging unchanged when the network drops — Box B takes over locally.

方案一 · A + 云Plan 1 · A + Cloud
方案二 · A + B + 云Plan 2 · A + B + Cloud
有网Online
云端实时计算并分配各桩电流Cloud computes and allocates in real time
云端决策,B 同步策略Cloud decides; B stays in sync
无网Offline
各桩回落预置保守值,充电不中断Chargers fall back to preset limits; charging continues
B 本地接管,体验与在线一致B takes over locally; nothing changes for drivers
点选四种运行状态Select an operating state
电网进线Grid supply主熔断器Main fuseCT ×3CT ×3箭头朝负载arrow to load盒子 ABox A电流采样Current sampling必配required云平台Cloud负荷均衡决策Load-balancing decisions充电桩群Charger group桩 1Charger 1桩 2Charger 2桩 3Charger 3盒子 BBox B本地决策 · 选配local decisions · optionalWiFi + LANWiFi + LAN断网接管takes over offlineWiFi · 上行采样WiFi · uplink桩经站点网络受控chargers via site network云端实时计算并分配各桩电流Cloud allocates charger currents in real time外网断开network lost各桩回落预置保守值,充电不中断Chargers fall back to preset conservative limitsWiFi · 上行采样WiFi · uplink云端直连桩群cloud to chargers策略下发policy pushCANCAN供电+通信power + dataLANLAN云端决策;断网时 B 自动接管,无需人工操作Cloud decides; Box B takes over automatically if the network dropsCANCAN供电+通信power + dataLANLAN外网断开 · 不参与决策network lost · not involvedB 本地持续动态分配,充电体验与在线一致Box B keeps allocating dynamically; experience unchanged

3典型接线方式Typical wiring

8 个标准用例覆盖欧标/北美电网、RS485 电表与第二路电源(光伏/储能)。点选查看通道占用与接线要点。8 standard cases cover EU / North American grids, RS485 meters and a second source (solar or storage). Click a case to see channel usage and wiring notes.

点选 8 个标准用例Select one of 8 standard cases
CT 采样CT metering
第二路电源Second source
电网进线Grid supplyL1 / L2 / L3盒子 A · 6 路 CTBox A · 6 CT channels左组 · 电网Left · GRID右组 · 光伏/储能Right · SOLAR / STORAGELeft L1Right L1Left L2Right L2Left L3Right L3CT 箭头必须指向负载 / 母线侧CT arrow must point to load / busbar光伏 / 储能Solar / Storage输出output电表MeterP1 · RS485P1 · RS485RS485RS485供电:L + Nsupply: L + N住宅、小站点:只接 L1Homes and small sites: L1 only供电:L1 + Nsupply: L1 + N参考电压只有一路,取自 A 自身供电线Single reference voltage from Box A supply供电:L1 + L2supply: L1 + L2分相 · 无 L3split-phase · no L3只有 2 路,无第三路;同一硬件的 2 通道配置2 channels only; same hardware,two-channel configuration供电:L + Nsupply: L + NRS485 优先RS485 first无 CT,经 RS485 读取电表;与 CT 并存时电表优先No CT; read over RS485; meter takesprecedence when both exist供电:L + Nsupply: L + N电网 L1 + 第二路电源 L1,各占一路Grid L1 + second source L1, one channeleach供电:L1 + Nsupply: L1 + N两组各 3 路,按来源分组Two groups of three, grouped by source供电:L1 + L2supply: L1 + L2分相 · 无 L3split-phase · no L3两组各 2 路,共 4 路Two channels per group, 4 in total供电:L1 + L2supply: L1 + L2分相 · 无 L3split-phase · no L3三相不接地 + 分相供电,此例以现场确认为准Three-phase ungrounded + split-phasesupply; confirm on site
左组 · 电网Left · GRID1 / 3
右组 · 光伏/储能Right · SOLAR / STORAGE0 / 3
合计占用total used1 / 6
左组 · 电网Left · GRID3 / 3
右组 · 光伏/储能Right · SOLAR / STORAGE0 / 3
合计占用total used3 / 6
左组 · 电网Left · GRID2 / 3
右组 · 光伏/储能Right · SOLAR / STORAGE0 / 3
合计占用total used2 / 6
左组 · 电网Left · GRID0 / 3
右组 · 光伏/储能Right · SOLAR / STORAGE0 / 3
合计占用total used0 / 6
左组 · 电网Left · GRID1 / 3
右组 · 光伏/储能Right · SOLAR / STORAGE1 / 3
合计占用total used2 / 6
左组 · 电网Left · GRID3 / 3
右组 · 光伏/储能Right · SOLAR / STORAGE3 / 3
合计占用total used6 / 6
左组 · 电网Left · GRID2 / 3
右组 · 光伏/储能Right · SOLAR / STORAGE2 / 3
合计占用total used4 / 6
左组 · 电网Left · GRID3 / 3
右组 · 光伏/储能Right · SOLAR / STORAGE3 / 3
合计占用total used6 / 6
用例 01 · 欧标单相Case 01 · EU single-phase电网侧:L1Grid side: L1光伏/储能侧:—Solar/Storage side: —

住宅、小站点:只接 L1Homes and small sites: L1 only

用例 02 · 欧标三相Case 02 · EU three-phase电网侧:L1 / L2 / L3Grid side: L1 / L2 / L3光伏/储能侧:—Solar/Storage side: —

参考电压只有一路,取自 A 自身供电线Single reference voltage from Box A supply

用例 03 · 北美分相Case 03 · NA split-phase电网侧:L1 / L2Grid side: L1 / L2光伏/储能侧:—Solar/Storage side: —

只有 2 路,无第三路;同一硬件的 2 通道配置2 channels only; same hardware, two-channel configuration

用例 04 · 电表 · RS485Case 04 · Meter · RS485电网侧:—Grid side: —光伏/储能侧:—Solar/Storage side: —

无 CT,经 RS485 读取电表;与 CT 并存时电表优先No CT; read over RS485; meter takes precedence when both exist

用例 05 · 欧标单相Case 05 · EU single-phase电网侧:L1Grid side: L1光伏/储能侧:L1Solar/Storage side: L1

电网 L1 + 第二路电源 L1,各占一路Grid L1 + second source L1, one channel each

用例 06 · 欧标三相Case 06 · EU three-phase电网侧:L1 / L2 / L3Grid side: L1 / L2 / L3光伏/储能侧:L1 / L2 / L3Solar/Storage side: L1 / L2 / L3

两组各 3 路,按来源分组Two groups of three, grouped by source

用例 07 · 北美分相Case 07 · NA split-phase电网侧:L1 / L2Grid side: L1 / L2光伏/储能侧:L1 / L2Solar/Storage side: L1 / L2

两组各 2 路,共 4 路Two channels per group, 4 in total

用例 08 · 北美三相Case 08 · NA three-phase电网侧:L1 / L2 / L3Grid side: L1 / L2 / L3光伏/储能侧:L1 / L2 / L3Solar/Storage side: L1 / L2 / L3

三相不接地 + 分相供电,此例以现场确认为准Three-phase ungrounded + split-phase supply; confirm on site

接线要点Wiring essentials
① CT 箭头一律指向负载 / 母线侧(图中左组朝右、右组朝左);CT arrows always point to the load / busbar side (left group to the right, right group to the left).
② 左组接电网侧、右组接光伏/储能侧——按来源分组,不按相序;Left group = grid side, right group = solar/storage side — grouped by source, not by phase order.
③ 盒子 A 取电:欧标 L+N,北美 L1+L2,有并网点(PCC)的场景取并网点之后;Box A supply: L+N (EU), L1+L2 (NA), after the point of common coupling (PCC) where one is present.
④ 电表经 RS485 接入,接口位于 Left L3 通道下方;与 CT 并存时读数以电表优先;The meter connects over RS485 below the Left L3 channel; meter readings take precedence when CTs coexist.
⑤ CT 经 3.5 mm 插孔接入,型号以订货确认清单为准;接线施工须由具备资质的电工按当地规范执行。CTs connect through 3.5 mm jacks; models per the confirmed order list; installation by qualified electricians per local codes.

4功能简介Functions

盒子 A 必配完成采样与上云;盒子 B 选配补上无网时的本地决策。Box A (required) handles sampling and cloud uplink; Box B (optional) adds local decisions when offline.

盒子 ABox A

必配 · 采样 + 传输REQUIRED · SAMPLING + UPLINK
  • 6 路 CT 逐秒采样,覆盖电网 / 光伏 / 储能回路6 CT channels sampled every second, covering grid, solar and storage circuits
  • WiFi 上行,数据 TLS 1.3 加密WiFi uplink, TLS 1.3 encrypted
  • Soft AP 本地配置,手机即可完成调试Soft AP local setup — configure with a phone
  • 断网静态兜底:桩回落预置保守限值Static fallback: chargers revert to preset conservative limits when offline
  • 预留 CAN 口:一根线为 B 供电并通信CAN port reserved: one cable powers Box B and carries data

盒子 BBox B

选配 · 本地离线服务器OPTIONAL · LOCAL OFFLINE SERVER
  • WiFi + 以太网 LAN 双上行,适配不同现场网络WiFi + Ethernet LAN, adapting to different site networks
  • 本地策略引擎,与云端同构Local policy engine, identical to the cloud
  • 断网 ≤ 60 s 自动接管,充电不中断Takes over within 60 s of a network loss; charging never stops
  • 本地控制周期 ≤ 5 s,与在线一致Local control cycle ≤ 5 s — same as online
  • 回网无扰回切,电流斜率 ≤ 2 A/sBumpless switch-back, current ramp ≤ 2 A/s
  • 加装只动一根 CAN 线,A 侧不改线One CAN cable to add; no re-wiring on the Box A side

5性能指标Specifications

硬件规格与系统行为指标。Hardware specifications and system behaviour.

硬件规格Hardware

项目Item规格Specification
采样通道Sampling channels6 路 CT:左组 3 路电网 / 右组 3 路光伏·储能6 CT inputs: left 3 for grid / right 3 for solar · storage
CT 接口CT connector3.5 mm 插孔,每通道一个3.5 mm jack, one per channel
采样周期Sampling interval≤ 1 s≤ 1 s
安装方式Mounting35 mm 标准导轨(DIN 导轨,IEC 60715)35 mm DIN rail (IEC 60715)
外形尺寸Dimensions盒子 A:65 × 90 × 33 mm
盒子 B:100 × 100 × 40 mm
宽 × 高 × 深
Box A: 65 × 90 × 33 mm
Box B: 100 × 100 × 40 mm
W × H × D
工作温度Operating temperature-30 ℃ ~ +50 ℃-30 °C to +50 °C
防护等级Ingress protectionIP20(柜内安装)IP20 (inside enclosure)
上行通信Uplink盒子 A:WiFi;盒子 B:WiFi + 以太网 LANBox A: WiFi; Box B: WiFi + Ethernet LAN
盒间连接Inter-box linkCAN:一根线供电 + 通信CAN: one cable for power + data
电表接入Meter inputP1 / RS485 电表P1 / RS485 meter
桩侧通信Charger linkModbus TCPModbus TCP
数据安全Data securityTLS 1.3TLS 1.3
电网制式Grid compatibility欧标单相/三相、北美分相EU single/three-phase, NA split-phase

系统行为指标System behaviour

项目Item规格Specification
动态控制周期Dynamic control cycle≤ 5 s≤ 5 s
断网接管(B 在位)Failover with Box B≤ 60 s,充电不中断≤ 60 s, charging continues
回网回切Switch-back on recovery无扰回切,电流斜率 ≤ 2 A/sBumpless switch-back, current ramp ≤ 2 A/s
断网(仅 A,无 B)Offline, Box A only各桩回落预置保守限值Chargers revert to preset conservative limits

6云端扩展功能Cloud extensions

云平台开箱即用,无需自建服务器。The cloud platform works out of the box — no self-hosted servers required.

▣

策略编排Policy orchestration

站点级负荷策略、时段与优先级在线配置,云端与盒子 B 同构下发Site-level policies, schedules and priorities configured online, delivered identically to Box B

▣

站点视图Site overview

多站点集中监控,实时状态与告警Central monitoring of all sites, live status and alarms

▣

数据看板Dashboards

充电与用电曲线、负荷统计报表Charging and energy curves, load statistics and reports

▣

电价优化Tariff optimization

按分时电价安排充电窗口,降低用电成本Schedule charging windows against time-of-use tariffs to cut energy cost

▣

OTA 与设备管理OTA & device management

远程固件升级与设备档案管理Remote firmware updates and device records